Jewelry Retailer – Image QA Tool

Delivered a robust MVP in 4 weeks, cutting manual editing by 60%.

Retail
Workflow Automation
RAG
Deliverables
  • Requirements document outlining core workflows
  • Functional MVP for image automation and QA
  • Interactive storyboards and wireframes
Services
  • Design to MVP sprint facilitation
  • Discovery and ideation workshops
  • UX/UI design and storyboarding
Technologies
  • Rules engine
  • Prompts (prompt engineering)
  • Retrieval-Augmented Generation (RAG)
Deliverables
Technologies
Services

Project Overview

Delivered a robust MVP in 4 weeks, cutting manual editing by 60%.

We partnered with a jewelry retailer to streamline product photography and catalog approvals. Using our Design to MVP Sprint methodology, we scoped, designed, and delivered an automated image QA MVP in four weeks. The solution uses a rules engine, prompts, and RAG to deliver real-time QA scoring of vendor-submitted jewelry photos for catalog approval—replacing manual checks with a scalable, user-friendly tool.

The Challange

  • Manual photo editing and quality checks consumed hundreds of hours each month, slowing product launches.
  • No clear workflow or feedback loop between photography, editing, and merchandising teams led to inconsistent imagery and brand guidelines drift.
  • Needed real-time QA scoring of vendor-submitted images for faster catalog approval.

Our Solution

We ran a two-week discovery with stakeholders, followed by rapid solution sketching and decision-making. The team built a working MVP in four weeks, integrating a rules engine, prompt-driven checks, and RAG to score images against brand standards in real time. We conducted usability testing to capture feedback and iterated quickly to refine performance and user experience.

Features:
  • Real-time QA scoring via a configurable rules engine
  • RAG-powered checks against brand and catalog guidelines
  • Interactive preview and approval workflow

The Results

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat.

35%

Faster case completion

90%

Staff adoption in 2 weeks

70%

Reduced task duplication

150M

Annual cost saving through improved efficency

The Results

4

Sprint Duration (Weeks)

60%

Processing Speed Increase

120

Monthly Manual Hours Saved

$100k+

Projected Annual Savings

Summary

Delivered a robust MVP in 4 weeks, cutting manual editing by 60%.

Focus Area

Project Overview

We partnered with a jewelry retailer to streamline product photography and catalog approvals. Using our Design to MVP Sprint methodology, we scoped, designed, and delivered an automated image QA MVP in four weeks. The solution uses a rules engine, prompts, and RAG to deliver real-time QA scoring of vendor-submitted jewelry photos for catalog approval—replacing manual checks with a scalable, user-friendly tool.

The Challange

  • Manual photo editing and quality checks consumed hundreds of hours each month, slowing product launches.
  • No clear workflow or feedback loop between photography, editing, and merchandising teams led to inconsistent imagery and brand guidelines drift.
  • Needed real-time QA scoring of vendor-submitted images for faster catalog approval.

Our Solution

  • Manual photo editing and quality checks consumed hundreds of hours each month, slowing product launches.
  • No clear workflow or feedback loop between photography, editing, and merchandising teams led to inconsistent imagery and brand guidelines drift.
  • Needed real-time QA scoring of vendor-submitted images for faster catalog approval.

The  Impact

The retailer transformed its product image pipeline. Automation cut manual editing time by more than half, improved brand consistency, and accelerated product launches. The successful MVP established a clear path to production rollout and additional automation opportunities.

MorelandConnect’s Sprint methodology gave us a clear path from ideation to MVP in just four weeks. We’re now saving hours of manual work every week and delivering consistent, high-quality images faster than ever.
Jessica Smith — Director of Digital Operations, Signet Jewelers

View More Success Stories

Our Clients Say It Best

Behind every project is a relationship built on trust, communication, and shared success. Here’s what that sounds like.

"The team is very personable; we feel like we're talking to friends."

Bill Vasil
Founder, CrewTrak

"Collaborating with Moreland on this project was an absolute pleasure."

Korey Silverman
Director of Operations, General Pipe Cleaners

"MorelandConnect has a great ability to keep the communication lines open with their clients."

Amie Brock
CEO, AIR Training Solutions

Ready to Transform Your Product Imagery?